Engineering Change Control
The Value of SYSPRO ECC
- Define workflow to document and control product design changes.
- Assign product design tasks to specific users/groups of users.
- Transfer tasks between users/groups of users.
- Define new task notifications, outstanding task reminders and electronic sign-off.
- Control BOM and/or routings maintenance with mandatory Engineering Change Orders (ECO).
- Optionally prevent creation or maintenance of purchase orders, jobs and sales orders for products on an ECO.
- Retrieve previous revisions of BOMs, routings and jobs from archives for production as planned or as built.
For more information read the Engineering Change Control Module PDF »
